Physics, asked by supreetpurohit28, 10 months ago

A particle of mass 100gm is thrown vertically
upwards with a speed of 5 m/s. The work done
by the force of gravity during the time the
particle goes up is (g = 10ms-2)​

Answers

Answered by Kishankr1234
0

A particle of mass 100 g is thrown vertically upwards with a speed of 5 m/s. The work done by the force of gravity during the time the particle goes up is Option 1) ...

1 answer

Answered by llxdevilgirlxll
4

Hyy Dude

Kinetic energy at projection point is converted into potential energy of the particle during rise. Potential energy measures the workdone against the force of gravity during rise.

(- work done) = kinetic energy = 1/2 mv²

OR ( - work done)

= 1/2 × ( 100/ 1000) (s) ² = 5× 5 / 2× 10 = 1.25]

Work done by force of gravity = 1.25.

May this helps you

Plz marked in brainlest answer

Similar questions