A path 2m wide surrounds a circular pond of diameter 40m . How many cubic meters of gravels are required to gravel the paTh to a depth of 7cm
Answers
Answered by
17
Answer:
Step-by-step explanation:
Attachments:
Answered by
14
Answer: 184.8 cubic meters of gravels are required to gravel the path to a depth of 7 cm.
Step-by-step explanation:
Since we have given that
Diameter of circular pond = 40 m
Radius of circular pond = 20 m
Width of path = 2 m
So, Radius of outer path = 20+2 = 22 m
Depth = 7 cm
So, Volume of gravels would be
Hence, 184.8 cubic meters of gravels are required to gravel the path to a depth of 7 cm.
Similar questions