Math, asked by raxxx, 1 year ago

a rectangular Park is 64 M long and 86 M broad find the cost of levelling the park at 4.50 per square and
financing the park at rupees 76.50 per meter

Answers

Answered by chirag48146
4
length =64m
breadth =86 m
area= 64*86
=5504 m^2
cost required for leveling per sq. m = 4.50
cost required for leveling 5504m^2
=4.50*5504
=24768

perimeter =2*(64+86)
=2*170
=340 cm

cost required for fencing per m = 76.50
cost required for fencing 340 m =76.50*340
=26010
Similar questions