A rectangular plot of land is 40m long. The cost of leveling the plot at the rate of RS 8 per my is RS 8320. Find (i) the breadth of the plot. (ii) the cost of fencing the plot at the rate of RS 27.5 per meter.
Answers
Answered by
19
i hope it will help
Attachments:
Answered by
26
Hey friend!
=>To find breadth first we need the area so the cost of area per metre square is 8 and total cost is 8320. So the area will be 8320/8
=8320/8
=1040
The area is 1040m square
Area=length *breadth
1040=40*breadth
1040/40=breadth
26=breadth
The breadth is 26m
Fencing means making a compound wall type so we have to find perimeter.
Perimeter = 2(length + breadth)
=2(40+26)
=2(66)
=132
So cost will be 132*27.5
=3630/-
=>To find breadth first we need the area so the cost of area per metre square is 8 and total cost is 8320. So the area will be 8320/8
=8320/8
=1040
The area is 1040m square
Area=length *breadth
1040=40*breadth
1040/40=breadth
26=breadth
The breadth is 26m
Fencing means making a compound wall type so we have to find perimeter.
Perimeter = 2(length + breadth)
=2(40+26)
=2(66)
=132
So cost will be 132*27.5
=3630/-
Similar questions
Math,
8 months ago
Political Science,
1 year ago
Hindi,
1 year ago
Music,
1 year ago
French,
1 year ago