A Sherpa of mass 80 kg is instructed to carry a package of mass 20 kg from the base camp to the summit of a mountain 1200 m high. ) How much work the Sherpa has to do against gravity? (m) Also, find the change in potential energy of the package if the potential energy at the base of the mountain is taken as zero.
Answers
Answer:
of mass 20 kg from the base camp to the summit of a
mountain 1200 m high. (i) How much work the Sherpa
has to do against gravity? (ii) Also, find the change in
potential energy of the package if the potential energy
at the base of the mountain is taken as zero.
(Take g = 10 m s-2) (Ans. 1.2 * 106 J, 2.4 x 1053)
1
SEE ANSWER
ADD ANSWER
+5 PTS
Log in to add comment
adityayadav770534 is waiting for your help.
Add your answer and earn points.
Answer
2.3/5
6
BrainlyAryabhatta
Genius
1.6K answers
703.5K people helped
Answer:
A Sherpa of mass 80 kg is instructed to carry a package
of mass 20 kg from the base camp to the summit of a
mountain 1200 m high. (i) How much work the Sherpa
has to do against gravity? (ii) Also, find the change in
potential energy of the package if the potential energy
at the base of the mountain is taken as zero.
(Take g = 10 m s-2) (Ans. 1.2 * 106 J, 2.4 x 1053)
laminiaduo7 and 12 more users found this answer helpful
THANKS
6
2.3
(6 votes)
Log in to add comment
Still have questions?
FIND MORE ANSWERS
ASK YOUR QUESTION
New questions in Physics
A Sherpa of mass 80 kg is instructed to carry a package of mass 20 kg from the base camp to the summit of a mountain 1200 m high. ) How much work the …
Read the passage and answer the following question The sound produced by the school will be heard by all of us irrespective of whether we are in room …
Is there any friction exerted on table placed on the surface of floor
Tere jaise ladke ko to me love to chodo like bhi ni karti Aditya = bhoot
PAGE:DATE:sotie3020S10IS2025Find theet In 20secdizplawmund :) In 15 secil) In 20 ¡¡¡) In 25 sec
For years this world has witnessed the death of many innocent people due to spite and power struggle ongoing on several occasions. This world has seen …
Calculate the Field of due to an electric dipole of length 10 cm and consisting of charges of +-100 micro cm² at a point 20 cm from each charges.
A particle is projected horizontally with speed of 9.8 m/s from height 980 m. Find velocity of the particle at time t=1s. Also find velocity with whic …
Take two identical blocks of wooden and iron of same area and a nail, place them inside the water in a tub one after the other. Write down the observa …
DATE:soHO302014S 10IS20 35Find the displacement is in is see ei) In 20 secii) In assec
Previous
Next
Explanation:
Please mark me as brainliest
Answer:
- A Sherpa of mass 80 kg is instructed to carry a package of mass 20 kg from the base camp to the summit of a mountain 1200 m high.
- How much work the Sherpa has to do against gravity? (m)
- Also, find the change in potential energy of the package if the potential energy at the base of the mountain is taken as zero.