Math, asked by shaluambawata1768, 5 months ago

A takes contract of doing landscaping work at the local park. However, at the end of 20days, 20% of the work was still remaining. He called his friend B for help and together finished the the remaining work in 3 days. If both A and B can do the work at the equal rate, how long would B have taken to finish the entire work on his own?

Answers

Answered by amitnrw
0

Given : at the end of 20 days, 20%  of the work was still remaining.

A and B finished the remaining work  in 3 days.

To Find : how long would B  have taken to finish the entire work  on his own

43 days

37.5 days

40 days

35.5 days​

Solution:

Let say Total Work is W

Work done by A in a day =    A

Work Done of A in 20 Days = 20 A

at the end of 20 days, 20%  of the work was still remaining

Work remaining = (20/100)W = 0.2W

Work Done by A  = W - 0.2W = 0.W

20A  = 0.8W

=> A = 0.04W

Work Done in 3 Days by A = 0.04 x 3 = 0.12W

Work Done by B in 3 Days = 0.2W - 0.12W = 0.08W

0.08W   , work done by B  = 3 Days

work done by B  = 3/0.08

= 37.5

B will take 37.5  days alone to finish the work

Learn More

A given work can be done by Amar in 10 days, by Akbar in 20 days ...

https://brainly.in/question/31429169

with P starting the work, working on alternate days P and Q can ...

https://brainly.in/question/12303996

A,b,c can do a piece of work in 150 days,75 days,75/2 days ...

https://brainly.in/question/8268307

Answered by Ameya09
2

Given : at the end of 20 days, 20%  of the work was still remaining.

A and B finished the remaining work  in 3 days.

To Find : how long would B  have taken to finish the entire work  on his own

43 days

37.5 days

40 days

35.5 days​

Solution:

Let say Total Work is W

Work done by A in a day =    A

Work Done of A in 20 Days = 20 A

at the end of 20 days, 20%  of the work was still remaining

Work remaining = (20/100)W = 0.2W

Work Done by A  = W - 0.2W = 0.W

20A  = 0.8W

=> A = 0.04W

Work Done in 3 Days by A = 0.04 x 3 = 0.12W

Work Done by B in 3 Days = 0.2W - 0.12W = 0.08W

0.08W   , work done by B  = 3 Days

work done by B  = 3/0.08

= 37.5

B will take 37.5  days alone to finish the work

Learn More

A given work can be done by Amar in 10 days, by Akbar in 20 days ...

brainly.in/question/31429169

with P starting the work, working on alternate days P and Q can ...

brainly.in/question/12303996

A,b,c can do a piece of work in 150 days,75 days,75/2 days ...

brainly.in/question/8268307

Similar questions