l =40m
b=15 m
area of verandah[rectangle]=l*b
=40m*15m
=600m.sq
and stone each measuring 6dm by5dm
by converting it into meter we get,
0.6m by 0.5m
now, area of stone= l*b
=0.6m*0.5m
=0.3m.sq
now, number of stone required =area of verandah/area of stone
=600m.sq/0.3m.sq
=600*10/3
=6000/3
=2000.
done! may you got use of this ....
l =40m
b=15 m
area of verandah[rectangle]=l*b
=40m*15m
=600m.sq
and stone each measuring 6dm by5dm
by converting it into meter we get,
0.6m by 0.5m
now, area of stone= l*b
=0.6m*0.5m
=0.3m.sq
now, number of stone required =area of verandah/area of stone
=600m.sq/0.3m.sq
=600*10/3
=6000/3
=2000.
done! may you got use of this ....
Answered by
22
Length and Breadth of Verandah = 40m & 15m respectively.
Length and Breadth of Stones = 2dm & 2dm = 0.2m & 0.2m [Since, 1m = 10dm => 1dm = 0.1m]
Area of Verandah = Length × Breadth
= 40m × 15m
Area of each stone = L × B
= 0.2m × 0.2m
Therefore nimber of stones required =
Therefore, 15000 stones are required to be paved.
THERE YOU GO!!!.....
Length and Breadth of Stones = 2dm & 2dm = 0.2m & 0.2m [Since, 1m = 10dm => 1dm = 0.1m]
Area of Verandah = Length × Breadth
= 40m × 15m
Area of each stone = L × B
= 0.2m × 0.2m
Therefore nimber of stones required =
Therefore, 15000 stones are required to be paved.