A woman completes 2/7th of her job in 5 days. At this rate, how many more days will she take to finish the job?
15.5 days
12.5 days
10 days
16 days
Answers
Answered by
8
2/7 th of a job in 5 days.
so 7 * 2/7 th of a job in 7 * 5 days.
ie.. two times the job in 35 days.
so the job is done in 35/2 = 17.5 days.
Already 5 days she spent in doing 2/7 of job. So she will need 12.5 more days.
so 7 * 2/7 th of a job in 7 * 5 days.
ie.. two times the job in 35 days.
so the job is done in 35/2 = 17.5 days.
Already 5 days she spent in doing 2/7 of job. So she will need 12.5 more days.