French, asked by shaillygupta9924, 3 months ago

ABC manufacturing deals in making special uniforms used for multipurpose. For making one uniform, standard direct material cost is Rs. 120 and 10 meters’ cloth (Direct Material) is required for making it. For making one uniform, tailor should be given Rs. 40 and for making one suit, time should not be more than 5 hours for making one uniform. ABC has planned to develop 750 uniforms in the month of March (2015). Total fixed FOH were included in standard cost on the basis of budgeted labor hours (Budgeted Fix FOH = 50,000). By analyzing the actual data, ABC manufactured uniforms (see table below) in the month of march. The actual cloth used is meter (see table) and for every meter, (Rs. Last two digits of your roll number) has been charged. Total actual time of tailors were (see table) hours at the rate of (last two digits of your roll number) per hour. Actual Fixed FOH were Rs. 37,000 in the month of March.

Answers

Answered by aastikdixit
1

Answer:

A hw hwheusu shdhhd hdhd

Answered by Rupeshsir
5

Answer:

official Full uffs Nikola Harish

Explanation:

thankyou

hope it will be helpful to you

Similar questions