If you want to schedule planned orders on the basis of production rates and takt times , use the planning table with Sequencing.

Sequencing is a production line-oriented, graphic tool that schedules the planned orders you create in the planning table or that were created in the planning run and then sequences them according to a predefined process.

As the planned orders dispatched in Sequencing are automatically firmed , you should only use Sequencing in the short-term period.

Prerequisites

  • In Line Design, you must create a line hierarchy for the production line.

  • In the line hierarchy, you must create a unit of measure for the production rate.

  • If this unit of measure deviates from the material’s unit of measure, you must specify the line hierarchy’s unit of measure and the conversion factor in the material master record, under Extras Units of measure .

  • You must specify the number of takts and the maximum production rate in the line hierarchy.

  • If necessary, you must create a rate routing in Line Design if you work with line balancing.

  • If necessary, you must carry out line balancing.

  • You must enter the line hierarchy in the production version of the material.

  • You must enter a repetitive manufacturing profile in the MRP data in the material master record.

  • You must select the indicator taktTm/rate sched. in Customizing for Repetitive Manufacturing in the activity, Define Scheduling Parameters for Planned Orders

  • In Sequencing, you must select the process for sequencing – that is either FIFO, manual or user exit. In so doing, the system automatically dispatches all planned orders you have assigned to a line.

  • Further prerequisites for working with Sequencing are described in the section Sequencing .