Physics, asked by Notin1234, 1 year ago

Akshat drops A ball of mass 4 kg from top of a tower 10 high take ground level at zero level and g is equal to 10 metre per second square then find work done by gravity the velocity of the ball just before it strikes the ground and the average power

Answers

Answered by vijaymakraria72
0

Answer:mgh=work done

Work=40×10×10

=4000

Explanation:

Similar questions