an electric power utility decides to add 50 mw of wind generation to its system. if the individual units are rated at 2 mw in a 12 m/s wind at standard conditions and have power coefficient of 0.35, mechanical and electrical efficiencies of 0.92 and 0.95. (i) calculate the rotor swept area and rotor diameter. (ii) if the turbine is required to deliver rated power at 20 rpm and the generator rated speed is 1500 rpm, calculate the average torque at low speed and high speed shaft?
please do the 2nd part i.e calcularion of avg torque. at.low speed and high speed. Please solve in details
Answers
Answered by
0
Explanation:
The energy landscape is under transition driven by megatrends, such as decentralization and decarbonization of energy generation, as well as digitization across the grid. The world is becoming more electric, as electricity is the most sensible and sustainable solution. EcoStruxure for Electricity Companies helps the electricity companies build a sustainable future by providing greener power generation, building better grids and serving affordable new energy to consumers while improving their profitability.
Similar questions