Physics, asked by ashokkumarchaurasia, 2 months ago

An engineer is required to visit a factory for exactly four days during the first 15 days of every month and it is mandatory that no two visits take place on consecutive days. Then the number of all possible ways in which such visits to the factory can be made by the engineer during 1-15 June 2021 is_____.​

Answers

Answered by singh123328
5

Ans

number of remaining days = 15 - 4 = 11 days

number of gape = number of remaining days + 1

= 11 + 1 = 12

now we have to arrange 4 days in 12 gape i.e., ¹²C₄ = 12!/(4! × 8!)

= 12 × 11 × 10 × 9/24

= 11 × 5 × 9

= 495

Then the number of all possible ways in which such visits to the factory can be made by the engineer during 1-15 June 2021 is 495

Answered by hanuhomecarepr72
3

Answer:

kindly refer to pic mate plz

Explanation:

hopefully u will love my channel ❤️❤️❤️❤️

Attachments:
Similar questions