An engineer working on a project was required to estimate the likely duration of that project as a preliminary activity. He immediately stated it to be eight months without doing any calculations. This estimation of time can be considered to be a result of- *
a)Judgement
b)Intuition
c)Both judgement and intuition

Answers

Answered by Yashi03032007
5

The following estimation can be considered as a result of INTUITION.

Answered by LoveyouDelhi
0

Answer:

PLEASE MARK AS BRANILST AND LIKE

Explanation:

intuition