An engineer working on a project was required to estimate the likely duration of that project as a preliminary activity. He immediately stated it to be eight months without doing any calculations. This estimation of time can be considered to be a result of- *
a)Judgement
b)Intuition
c)Both judgement and intuition
Answers
Answered by
5
The following estimation can be considered as a result of INTUITION.
Answered by
0
Answer:
PLEASE MARK AS BRANILST AND LIKE
Explanation:
intuition