An NGO is helping the poor people of earthquake hit village by providing medicines. In order to do this they set up a plant to prepare two medicines A and B. There is sufficient raw material available to make 20000 bottles of medicine A and 40000 bottles of medicine B but there are 45000 bottles into which either of the medicine can be put. Further it takes 3 hours to prepare enough material to fill 1000 bottles of medicine A and takes 1 hour to prepare enough material to fill 1000 bottles of medicine B and there are 66 hours available for the operation. If the bottle of medicine A is used for 8 patients and bottle of medicine B is used for 7 patients. How the NGO should plan his production to cover maximum patients? How can you help others in case of natural disaster?
Answers
Answered by
4
Let x thousand of Medicine A and y thousand of Medicine B should be produced.
The objective function is 8000x+7000y,which is to be maximized
Now the constraints are
For bottle,
x+y less than or equal to 45
For time,
3x+y less than or equal to 66
with x less than or equal to 20 and y less than or equal to 40
The objective function is 8000x+7000y,which is to be maximized
Now the constraints are
For bottle,
x+y less than or equal to 45
For time,
3x+y less than or equal to 66
with x less than or equal to 20 and y less than or equal to 40
Similar questions