An oil company bores a hole 80m deep. Estimate the cost of boring if the
cost is £30 for drilling the first meter with an Increase in cost of £2 per
meter for each Succeeding meter.
Answers
Answered by
1
Answer:
in this question we have to put the mathematical geomatrical
Similar questions