If 25 persons can dig a trench 36m long in one day,then find the number of persons required to dig a trench 108 m long in one day ​

Answers

Answered by NuraAlFaiyz
1

ANSWER

36m trench can be dig by = 25 persons

1 m trench can be dig by = 25/36 persons

108m trench can be dig = 25 × 108/36

= 72 persons

Answered by nikshay456
4

Answer:

Hope my answer helps you mate :-)

Step-by-step explanation:

Length of trench dug by 25 person=36m

Trench dug by 1 person =36/25

Trench(108m) dug =108×25/36

=3×25=75person