Ariv, Ahaan and Arya start a game of preparing bead necklaces. Ariv takes 12 minutes, Ahaan takes 18 minutes and Arya takes 24 minutes to prepare one bead necklace. After how much time will all the three children start to prepare a new necklace simultaneously?
Answers
Answered by
1
Answer:
Step-by-step explanation:
time required to start a new necklace together is the average time =
12+18+24/3
= 54/3
=18 minutes
Similar questions