Aside from being timely and sample,how do you think corrective actions from plan deviation should be and how do you think it will benefit the project? Is it right to say that deviation are occurring because team members are not following what is planned,and control system are just waste of resources,funds and time
-.-
Answers
Answered by
0
The answer to the given question is written below.
- No, aside form being timely and simple, the corrective actions should also be linked with the flexibility of the operations.
- The deviations occurring should be analysed properly and carefully diagnosed before drawing out a conclusion.
- The team members should also be obeying the guidelines and contribute towards their goals in order to prove their effectiveness.
- Thus, if we maintain the control measures correctly, we won't be wasting any resources and we can achieve the objectives.