Math, asked by vinayakmane0333, 4 months ago

At 60% Level of Production the amount of factory
overhead is 40000 (40% Fixed ). At 100% level of
production it amounts to

Answers

Answered by deepakmapari204
1

Answer:

l don't know the answer sorry

Answered by rohitkumargupta
0

Answer:

The total Production amount = 66666.6667

Step-by-step explanation:

Given that ,

At 60% Level of Production the amount of factory overhead is 40000 (40% Fixed ). At 100% level of production it amounts ?

So,

by using Unitary methods,

let the amount be X.

60% of X = 40000

X = \frac{(40000)(100)}{(60)}

X = 66666.6667

Therefore, the total amount of the Production is 66666.6667.

And it 40 % = 66666.6667 - 40000

                   = 26666.6667

THANKS.

#SPJ3.

https://brainly.in/question/50788677

Similar questions