At the beginning of a month a factory has enough material to make 240 tonnes of steel in a month. If 60 more tonnes of steel is to be made that month how long will the material last
Answers
Answered by
7
answer is 1 1/4 months
Attachments:
Answered by
12
let the material is m unit for 240 tonnes
then how much unit is required for 240 + 60 = 300 tonnes
requied material = 300m/240
requied material = 5m/4
extra required material = 5m/4 - m
= m / 4 units
if m --------. 100 %
then m/4 --------. ?
= 25 %
so 25% more units required
then how much unit is required for 240 + 60 = 300 tonnes
requied material = 300m/240
requied material = 5m/4
extra required material = 5m/4 - m
= m / 4 units
if m --------. 100 %
then m/4 --------. ?
= 25 %
so 25% more units required