Math, asked by mihirpal90, 1 month ago


At the beginning of a month, a factory has enough materials to make 240 tonnes of steel
in a month. If 60 more tonnes of steel is to be made that month, how long will the
materials last?​

Answers

Answered by BincyRoy
0

Answer:

So, 240+60=300 240 + 60 = 300 Tonnes of steel to be manufactured in the month. Therefore, More steel manufactured, less days the material will last.