B. A group of workers
take 8 hours to load
15 trucks with bricks.
How much
time
would the group take to load 2 trucks with bricks?
Answers
Answered by
4
Answer:
64minutes
Step-by-step explanation:
time taken to fill 15 trucks = 8 hours
time taken to fill l5 trucks = 8 × 60 minutes
time taken to fill 15 trucks = 480 minutes
time taken to fill 1 truck = 480/15
time taken to fill 1 truck = 32
time taken to fill 2 trucks = 32 × 2 = 64 minutes