Beginning with the second day, the amount of work
Ram can do per day keeps doubling everyday he
works. Saleem can always do the work done by
Ram in 40% less time. Owing to this increasing
ability, Saleem and Ram complete the job together
in 2 days. How many days would it have taken if
their efficiencies had remained constant?
(A) 4
(B) 6
(C) 5
(D) 3
Answers
Answered by
4
Answer:
3
Step-by-step explanation:
Let the d be the number days taken by Ram to complete the work initially
Since he works for two days therefore he does 1/d + 2/d of the work (double on the second day).
Saleem does 1/0.6d + 2/0.6d of the work( since he does the work in 40% less time than ram.
total work done is sum of work done by saleem and ram. d=8
Ram takes 8 days and saleem takes 8*0.6 days to complete the work.
Total days if the efficiency remains same 8*4.8/8+4.8 = 3 days
Similar questions