Calculate material mix variance when, cost of a chemical mixture manufactured by Abex Pvt. Ltd. as under:
Standard Cost Actual Cost
20 tons of material X at Rs.40 per ton 20 tons of material X at Rs.30 per ton
30 tons of material Y at Rs.50 per ton 40 tons of material Y at Rs.59 per ton
Std. Yield is 80% of output Actual Yield is 32.5 tons
Answers
Answered by
0
Answer:
you can find in the computer