Science, asked by divyansh5274, 4 months ago

calculate the amount of work done in lifting a heavy load of 50 kg up to the height of 3m g= 10​

Answers

Answered by saurishsois
12

Answer:

M= 50kg

g= 10

(distance) S= 3m

W= mgh

W=50×10×3

W= 1500J

please mark me as..

Answered by PoojaBurra
0

Given,

Mass of a heavy lead = 50 kg

Height = 3 m

g = 10 m/s^2

To Find,

The amount of work done in lifting the heavy lead =?

Solution,

We can solve the question using the following steps:

The work done on a mass m is equal to,

W = Fd = mgh

Here, m = Mass of the object

           h = Height

Substituting the given values in the above equation,

W = 50*10*3

     =1500 J

Hence, the amount of work done in lifting a heavy load is 1500 J.

Similar questions