calculate the amount of work done in lifting a heavy load of 50 kg up to the height of 3m g= 10
Answers
Answered by
12
Answer:
M= 50kg
g= 10
(distance) S= 3m
W= mgh
W=50×10×3
W= 1500J
please mark me as..
Answered by
0
Given,
Mass of a heavy lead = 50 kg
Height = 3 m
g = 10 m/s^2
To Find,
The amount of work done in lifting the heavy lead =?
Solution,
We can solve the question using the following steps:
The work done on a mass m is equal to,
Here, Mass of the object
Height
Substituting the given values in the above equation,
Hence, the amount of work done in lifting a heavy load is 1500 J.