Math, asked by as1142120, 9 months ago

calculate the work done by a
a man who lifts 6 bricks each weighing 3N and put them at a height of 2.3 m above the ground.​

Answers

Answered by Lexi19
8

Answer:

Hi Pal!! sorry for a late answer

workdone=force×distance

                = 6×2.3

                =13.8

Answered by stgssubhasreesil1593
0

Answer:

hi.

work done-3*2.3

=6.9

please mark me as brainlist

Similar questions