Calculate the work done in raising a stone of mass 5kg and specific gravity 3, lying at the bed of a lake through a hight of 4m.
Ans=130.7 J
Answers
Answered by
64
Loss of weight in water = weight in air / specific gravity = 5/3
Weight of stone in water = 5-5/3 = 10/3
Force = 10/3 x 9.8 = 98/3
Work done = 4 x 98/3 = 130.666 => 130.7(appx)J
Weight of stone in water = 5-5/3 = 10/3
Force = 10/3 x 9.8 = 98/3
Work done = 4 x 98/3 = 130.666 => 130.7(appx)J
Answered by
23
Loss of weight in water = weight in air
/ specific gravity
= 5/3
Weight of stone in water = 5 - 5/3
= 10/3
Force = 10/3 × 9.8
= 98/3
Work done = 4 × 98/3
= 130.7 J ( approximately)