calculate the work done when a load of 100 kg is lifted vertically by 5m. ( g = 9.8 m / s square
Answers
Answered by
0
zero is correct answer i think
Answered by
1
By U=mgh
100*9.8*5=4900J
100*9.8*5=4900J