Can somebody give me Work Breakdown Structure of a project in which I want to develop solar driven pump sets for agriculture?
Answers
The scheme is divided into three different components - installation of standalone solar pumps, solarisation of grid-connected pumps and commissioning of grid-connected solar power plants. Through this scheme, the government targets to add 25,750 MW of combined solar capacities (all three components) by the year 2022.
Components of the new scheme
The scheme has a total of three main components:
Component A - 10,000 MW of Decentralized Ground-Mounted Grid-Connected Renewable Power Plants of 500 kW to 2 MW individual plant size to be commissioned by 2022.
Component B - 17.50 lakh standalone solar powered pumps with capacity up to 7.5 HP to replace diesel-powered agricultural pumps.
Component C - 10 lakh grid-connected agricultural pumps with up to 7.5 HP individual pump capacity to be solarised by 2022.
The government intends to execute components A and C of the scheme in a pilot mode till 31st December 2019 whereby commissioning of 1000 MW capacity of ground-mounted solar power plants and solarisation of 1 lakh grid-connected pumps would be completed. In the case of component B, the entire scheme would take place full-fledgedly