Compare and contrast distribution requirements planning (drp) with material requirements planning (mrp). How are they similar and how are they different?
Answers
Answered by
1
It is a logical extension of Material Requirements Planning (MRP), although there is one fundamental difference between the two. MRP is determined by a production schedule that is defined and controlled by the enterprise. On the other hand, DRP is guided by customer demand, which is not controllable by the enterprise