Compute the multifactor productivity measure for an eight-hour day in which the usable output was 300 units, produced by three workers who used 600 pounds of materials. Workers have an hourly wage of $20, and material cost is $1 per pound. Overhead is 1.5 times labor cost.
Answers
Answered by
22
Compute the multifactor productivity measure for an. ... materials. Workers have an hourly wage of $20, and material cost is $1 per pound. Overhead is 1.5 times labor cost. Labor cost ...
Answered by
9
The answer is .
Given:
Eight hour day
Usable output is 300 units
Weight of materials output = 600 pounds
Hourly wage of 3 workers each = 20
Overhead cost is 1.5 times the labour cost
To Find:
The multifactor productivity measure
Solution:
The total labour cost is
Hence the overhead cost is
The materials cost is
The multifactor productivity measure is given by
The multifactor productivity measure is .