Correct order of control methods poka yoke, inspection, flagging
Answers
Answered by
2
The correct order is - Inspection - Poka Yoke - Flagging.
Mistake Proofing is done by using techniques that prevent defects and it helps in detecting any defect if it is present as soon as possible.
The first step is to inspect for any defect and if any defect has been detected, it provides back the information to the source of the error.
Poka Yoke is a method or a product that eliminates defects by prevention of any unintentional human errors.
If the defect cannot be eliminated, the Poka-Yoke introduces a flag and flags the system.
Mistake Proofing is done by using techniques that prevent defects and it helps in detecting any defect if it is present as soon as possible.
The first step is to inspect for any defect and if any defect has been detected, it provides back the information to the source of the error.
Poka Yoke is a method or a product that eliminates defects by prevention of any unintentional human errors.
If the defect cannot be eliminated, the Poka-Yoke introduces a flag and flags the system.
Similar questions
Math,
7 months ago
Social Sciences,
1 year ago