Business Studies, asked by Snehasonu5277, 1 year ago

Correct order of control methods poka yoke, inspection, flagging

Answers

Answered by writersparadise
2
The correct order is - Inspection - Poka Yoke - Flagging.

Mistake Proofing is done by using techniques that prevent defects and it helps in detecting any defect if it is present as soon as possible.

The first step is to inspect for any defect and if any defect has been detected, it provides back the information to the source of the error.

Poka Yoke is a method or a product that 
eliminates defects by prevention of any unintentional human errors.

If the defect cannot be eliminated, the Poka-Yoke introduces a flag and flags the system.
Similar questions