customer M enters into a 20 years contract with energy supplier S to install, operate and maintain a solar plant for M's energy supply. M designed the solar plant before it was constructed. M hired experts in solar energy to assist in determining the location of the plant and the engineering of the equipment to be used. M has the exclusive right to receive and the obligation to take any energy produced. Whether it can be established that M is having the right to control the use of identified asset?
Answers
Answered by
1
Answer:
since 444 dj a great time to meet the criteria
Explanation:
क skooli a great time to meet the needs a great time to meet the criteria of this communication including the other one or both
1. di a great time
Similar questions