Description
In a hydroelectric power plant water flows from an elevation of 475 ft to a turbine, where electric power is generated. For an overall turbine-generator candy
of 0.7 percent, determine the minimum flow rate (in ft3/s) required to generate 250 kW of electricity. The density of water is 624 bmts. The minimum flow rate
required to produce 250 kW of energy dis ft3/s.
Answers
Answered by
0
Answer:
igsodystosototaaiiatiaattiatistiaitatostkaltaLT
Explanation:
hhhh
Similar questions