Business Studies, asked by kdaraksha86, 6 months ago

Determination of standard work is done with the help of : *

Time study.
Motion study.
Fatigue study.
All of the above.​

Answers

Answered by Anonymous
3

Standard work-in-process (or Standard WIP, or SWIP) is the designated minimum amount of material needed to keep your Standard Work flowing. It is one of the three main components of Standard Work. The other components include balancing the work to the takt time, and assigning it to a single operator.