Determination of standard work is done with the help of : *
Time study.
Motion study.
Fatigue study.
All of the above.
Answers
Answered by
3
Standard work-in-process (or Standard WIP, or SWIP) is the designated minimum amount of material needed to keep your Standard Work flowing. It is one of the three main components of Standard Work. The other components include balancing the work to the takt time, and assigning it to a single operator.
Similar questions