determination of the quantity of items of for single storey 1 bhk residential load bearing structure
Answers
Step-by-step explanation:
The cost of construction depends majorly on the following factors:
Architectural Design opted (like Open Top, Sloped Roofs, terraces with add-on features etc.,)
Structural Design (depends upon type of strata available for foundation and numbers of floors / configurations (basement, stilt,G+2 etc.)
Specification of Building materials selected (Quality/Brand of materials used for painting, flooring, woodwork, Bathroom, Electrical etc.)
Exterior Finish chosen (i.e. front elevation design, stone cladding, facade, etc.)
Peripheral external developments (such as compound wall, driveway, landscape, hardscape, Gate etc,).
The other minor cost head would be cost of liaison, charges for construction permits & building approvals.
The Construction cost can be broadly split into Labor and Material Cost. The extremely increasing construction trends are considered the driving force behind this fast upraise of total building construction costs. Taking this trend, the material manufactures have raised the prices of materials considerably in last decade or so.
Before planning for a bungalow/individual construction unit, one must be aware of the quantities and Cost Of Building Materials as they constitute around 55-60% of the total construction cost of a house. While taking a personal round of the nearby market, one should also avail services of construction turnkey solution providers and then take a judicious decision before the start of the construction.
Refer the info graphic to get the building material consumption and their costs for a 1000 Sqft budget house construction. The material quantities can be extrapolated based on the built up area of construction you are planning for.