Difference between risk transfer and risk shifting
Answers
Answered by
0
risk response stretchy aimed at reducing the risk impact by transfering the responsibility for a risk event for a third party
Answered by
0
Above answer is absolutely correct
know more :-
- Technical risks are those events or issues associated with the scope definition, research and development (R&D), design, construction, and operation that could affect the actual level of performance vs. that specified in the project mission need and performance requirements documents.
- Schedule risk is the risk associated with the adequacy of the time allotted for the planning, R&D, facility design, construction, and startup operations.