risk response stretchy aimed at reducing the risk impact by transfering the responsibility for a risk event for a third party
Answered by BrainlyPARCHO
0

\large \green{ \fcolorbox{gray}{black}{ ☑ \: \textbf{Verified \: answer}}}

Above answer is absolutely correct

know more :-

  • Technical risks are those events or issues associated with the scope definition, research and development (R&D), design, construction, and operation that could affect the actual level of performance vs. that specified in the project mission need and performance requirements documents.

  • Schedule risk is the risk associated with the adequacy of the time allotted for the planning, R&D, facility design, construction, and startup operations.