direct material =$10,000
direct labour = 15,000
manufacturing overhead =5,000
calculate the prime cost
Answers
Answered by
3
REQUIRED ANSWER:-
DIRECT MATERIAL COST=$10,000
DIRECT LABOUR COST=$15,000
MANUFACTURING OVERHEAD=5,000
NOW TOTAL THESE AMOUNT
= $10000+$15000+$5000=30,000.