Discuss in brief about case study of metro project in pune city also discus different challenges & its future development.
Answers
Pune Metro (proposed name:[9][10] Pune - Pimpri Chinchwad Metro) is a metro rail based rapid transit system under construction to serve the city of Pune and its Industrial Estate Pimpri Chinchwad in the Indian state of Maharashtra. As of March 2018, the system comprises 3 lines with a total length of 54.58 km. The 16.59-km Line 1 (PCMC Building – Swargate) will be elevated between the headquarters of the Pimpri-Chinchwad Municipal Corporation (PCMC Building) in Pimpri to Range Hills, from where it will run underground. Line 2 will run from Vanaz to Ramwadi covering a distance of 14.66 km on an elevated viaduct.[11] Lines 1 and 2 are expected to be operational in 2021.[12] The 23.33-km elevated Line 3 will run from the Rajiv Gandhi Infotech Park in Hinjawadi via Balewadi to Shivajinagar. All three lines will align at the Civil Court interchange station.[7][8].