Economic lot sizing with consideration of random machine unavailability time
Answers
Answered by
3
Answer:
Explanation:
The unavailability time may arise from the fact that the machine is being used to produce different products without knowing before hand the production schedules of those products. Another possibility could be that the machine has to be maintained after producing a lot and the maintenance time is random.