Environmental Sciences, asked by msanudeep4879, 1 year ago

Environment impact assessment in india a critical analysis

Answers

Answered by Abhishek9890
0
The Environment Impact Assessment (EIA) report of the 2000 MW Lower Subansiri Hydroelectric Project prepared by the WAPCOS (Water and Power Consultancy Service, 2003) indicates that downstream survey was done only up to 7 km from the dam site without giving much importance to the actual scenario and avoiding some most crucial ecological aspects. In the report, insufficient records of terrestrial flora, phytoplanktons and fish diversity are given. No records of aquatic macrophytes, riparian flora, zooplanktons, avian fauna, floodplain crops, besides peoples' livelihood and diverse habitat provided by the river in its downstream are presented in the report. Especially the wetlands, associated and influenced by the unregulated Subansiri River did not find any place in the EIA report. Interestingly, no mention of the Ganges Dolphin--Platanista gangetica gangetica Roxb. could be found in the report, whereas the river provides a healthy habitat for a good number of this critically endangered fresh water dolphin. From our pre-impact study, it is clear that rich downstream ecology of the river with its present and existing environmental scenario will be adversely affected due to the construction and operation of the proposed project, and there will be distinct possibilities of elimination of other native species. In addition, people's livelihood will be affected largely through alteration of the flow regime of the river. In-depth study with comprehensive documentation of all biotic and abiotic parameters is obligatory before taking any decision about the operation of the 2000 MW Lower Subansiri Hydroelectric Project.
Similar questions