Example 3.3 : 20 men require 25 days to dig a trench 50 m long, 20 m broad and 1 m der Ke
1
How many days will be required for 60 men to dig a trench 90 m long, 60 m broad and m deep
Answers
Answered by
1
plz change the numbers only formula is correct
Answer: Let the required length be x metres.
More breadth, Less length (Indirect Proportion)
More depth, Less length (Indirect Proportion)
More days, More length (Direct Proportion)
Breadth 20 : 50] : : 100 : x
Depth 15 : 10] : : 100 : x
Days 10 : 30] : : 100 : x
∴ 20 × 15 × 10 × x = 50 × 10 × 30 × 100
x = 50 × 10 × 30 × 100/20 × 15 × 10
x = 500 m
Hence,
The length of second trench is 500 m.