Example:
A single-station assembly machine performs five work elements to assemble four
components to a base part. The elements are listed in the table below, together with the
fraction defect rate (q) and probability of a station jam (m) for each of the components
added (NA means Not Applicable).
Time to load the base part is 3 sec and time to unload the completed assembly is 4 sec,
giving a total load/unload time of Th = 7 sec. When a jam occurs, it takes an average of
1.5 min. to clear the jam and restart the machine. Determine:
(a) Production rate of all products
(b) Yield of good product
(c) Production rate of good products
(d) Uptime efficiency of the assembly machine
Quantitative Analysis of
Assembly Systems
Element Operation Time (sec) q m p
1 Add gear 4 0.02 1
2 Add spacer 3 0.01 0.6
3 Add gear 4 0.015 0.8
4 Add gear and mesh 7 0.02 1
5 Fasten 5 0 NA 0.012
Answers
Answered by
2
Answer:
5=23+90-90+88\34_776