Explain COCOMO model with an example.
OMMSINGH:
The Constructive Cost Model (COCOMO) is a procedural software cost estimation model developed by Barry W. Boehm. The model parameters are derived from fitting a regression formula using data from historical projects (61 projects for COCOMO 81 and 163 projects for COCOMO II).
Answers
Answered by
0
the full form of COCOMO is constructive cost model.it is a cost estimation model.it was developed by W.boehm.
Similar questions