Explain fixing of Shahabad tiles for garden paving.
Answers
Products | BAL AdhesivesA pourable tile adhesive for floors, BAL Pourable One is perfect for fixing large and small format ceramics, porcelain and vitrified tiles, most natural ... The sophisticated design of this Uberhaus Shanghai patio set transforms your ... Glossary The lingo and jargon of professional restorers explained
Answer:
When speaking of Shahabad tiles for garden pavement, three distinct types of pattern interlock systems are used…..1. Vertical type, 2. Rotational type and 3. Horizontal type.
Explanation:
The three types are achieved in three different ways. Vertical interlock is achieved by load transfer method. Rotational type is achieved by right paver thickness and horizontal type is achieved by paying patterns.
You may need different components including Geotextile, subgrade, base, edge restraint, joint sand and concrete pavers.
Before you get started utility location is the most important aspects which include locating utilities like sanitary, water, sewer, electrical etc. Apart from these, other utility location set up would also include telephone lines, irrigation pipes, cable TV etc.
This process of set up is important before demolition or construction. Planning well ahead of time would reduced chances of damages.
It is important to get started by identifying the perfect are even before it is excavated. Marking can be done before time. You need to measure each excavated area for elevation of the pavement. At final elevation, strings can be used for marking the paving area. It is important to set up perfect slope for pavement that can be around 2 percent to 12 percent.
Set up base that is half inch wider in the sides of the pavement. The excavators need to ensure that they have made use of right base material for getting ideal compact base layer.
At the edges of the pavement edge restraints can easily be installed in the form of bedding sand. Try and make use of perfect bedding lines so sand or base material does not escape beneath the tiles. Back fills can be provided as support beneath each tile.
Try and make use of loose screed washed sand for setting up the bed. You can try and maintain right thickness that is equal to 12 inches or 25 mm. Next the process of layer with pavement tiles can be done.