Explain the elaborate procedure adopted in well sinking?
Answers
Answered by
0
Explanation:
Construction of Well Steining, Sinking of the Well Foundation
The steining should be built in short height of 1.5 m initially and 3 m after a 6 m grip length is achieved. The verticality should be maintained. The aim of the well sinking is to sink the well vertically and at the correct position. The following precautions are to be taken as far as possible.