f 6 man and 8 boys can do a piece of work in 10 days, while 26 men and 48 boys can do the same work in 2 days, then what is the time taken by 1 men and 20 boys in doing the same type of work ?

Answers

Answered by komal584
0

Step-by-step explanation:

B) 4 days

Description for Correct answer:

(6m+8b)×10 days

=(26m+48b)×2 days

[m1×t1×d1w1=m2×t2×d2w2]

30m+40b=26m+48b

4m = 8b

m = 2b

mb=21

1m (work) = 2 units/day

1b (work) = 1 units/day

Hence,

Total work

=(6×2+8×1)×10

=200 units

Required Time

(15m+20b)

=200(15×2+20×1)=20050=4 days