find the cost of digging a cuboidal pit 8 m long , 6m wide and 3m deep at the rate of RS.30 per m3.
Answers
Answered by
2
♚Find the cost of digging a cuboidal pit 8 m long, 6 m broad and 3 m deep at the rate of 30 per m 3
✌ANSWER
✔l=8 m, b=6 m, h=3 m
✔Volume =l×b×h=(8×6×2)m^3
=144m^3
✔Cost of digging per m ^3 volume =Rs.30
✔Cost of digging per 144m ^3 volume =Rs.144×30
= Rs. 4320
▣▣▣▣▣▣▣▣▣▣▣▣▣▣▣▣▣▣