Math, asked by wwwkizdaniel147, 1 month ago

Find the cost of tilling Rectanglar plot of land 300m long
and 150m wide at the rate
of 4 cedies per 100 square meter?​

Answers

Answered by michaelperezlopez
0

Answer: 270,000

Step-by-step explanation:

a = lw

a = 300)(150)

a = 45,000

then multiply this by 6 to find the total cost

45,000 (6) = 270,000

so the cost of the plot is 270,000

Similar questions